Subdivision Plat Drafting Checklist for Municipal Submittal
Plats are reviewed against a written ordinance, so most rejections come from missing items rather than bad design. This checklist covers the elements most U.S. jurisdictions look for. Always confirm against the local subdivision regulations, because requirements vary by state, county and city.
Preliminary plat or final plat?
A preliminary plat shows the proposed layout for review. It often includes existing topography, proposed streets and lots, utilities, drainage and phasing. A final plat (or record plat) is the legal document that gets recorded. It focuses on the boundary, lots, rights-of-way, easements, dedications and the required certificates. Many items below apply to both, and the final plat is usually held to tighter formatting rules.
Sheet basics
- Plat title with the subdivision name and phase
- Location description, such as section, township and range, or survey and abstract, plus county and state, as your state uses
- Vicinity map
- North arrow, written scale and graphic scale
- Legend for symbols and linetypes
- Sheet size, margins and recording area as required by the recording office
- Sheet index and match lines for multi-sheet plats
Boundary and geometry
- Basis of bearings and point of beginning
- Bearings and distances on every boundary and lot line
- Curve data in a table or on the line: radius, arc length, delta angle, chord bearing and chord distance
- Monuments found and set, with descriptions
- Total area, and the area of each lot
- Ties to adjoining plats, section corners or control, as required
Lots, streets and easements
- Lot and block numbers, numbered in a consistent sequence
- Street names and right-of-way widths, with any dedication to the public clearly labeled
- Easements with type, width, and whether they are created by the plat or by a recorded document
- Building lines or setbacks, where the jurisdiction requires them on the plat
- Common areas, reserves or open space with their intended ownership and use
- Adjoining owners or recorded subdivisions
Notes and data
- Flood zone note with the FIRM panel number and effective date
- Zoning designation, if required
- Utility providers and any service notes the jurisdiction requires
- Drainage and maintenance responsibility notes for common areas
- Any conditions of approval that must appear on the plat
Certificates and signature blocks
- Owner’s dedication and acknowledgment (notary block)
- Surveyor’s certificate for the licensed surveyor’s signature and seal
- Engineer’s certificate, where required
- Approval blocks for the planning commission, governing body, city or county engineer, and other reviewing agencies
- Recording information block for the county clerk or recorder
The wording of these blocks is usually prescribed by the jurisdiction. Copy it from the current ordinance or an approved recent plat in the same jurisdiction rather than from an older template.
Drafting quality checks before submittal
- Closure. The boundary and every lot close mathematically.
- Areas add up. Lot areas plus rights-of-way and reserves equal the total area.
- Labels are complete. No line is missing a bearing, distance or curve label, and no label overlaps another.
- Text is legible at plot scale, and meets any minimum text height the recording office sets.
- Sheets agree. Values that repeat across sheets, tables and notes match.
- The plat matches the latest review comments, and each comment has a tracked response.
Who is responsible for what
A drafter assembles the plat from the survey, the design and the jurisdiction’s requirements, and checks it for completeness. The licensed surveyor certifies the boundary and plat, and the engineer of record is responsible for the design. Approval comes from the jurisdiction.
Locus CAD Works drafts preliminary and final plats, lot layouts and submittal packages for U.S. engineers and surveyors, on your title block. See subdivision and plat drafting or request a quote.
