Skip to main content
Locus CAD Works
Services Process Why Locus About Contact info@locuscadworks.com
info@locuscadworks.com

Guides

What to Send for an ALTA/NSPS Survey Drafting Job

By Locus CAD Works · November 14, 2026 · 4 min read

An outsourced drafter can only draw what the survey file supports. The fastest ALTA/NSPS jobs are the ones where the first package already answers the drafter’s questions. This checklist covers what to include so the first draft comes back close to final.

Short answer

Send the field data, the title commitment with its Schedule B documents, the record documents you relied on, the Table A items agreed with your client, your boundary decisions, and your CAD template and title block. The surveyor of record makes the boundary determinations and signs the certification. The drafter turns those decisions into a clean, standards-compliant drawing.

1. Field data

  • Raw data or point files. Export the coordinates in the order your office uses, such as PNEZD, and say which order it is.
  • Coordinate system and datum. State plane zone, units (U.S. survey feet or international feet), and the vertical datum if elevations are shown.
  • Basis of bearings. The line or system the bearings are based on, as it should appear in the notes.
  • Monuments. A list of monuments found and set, with descriptions (for example, “5/8″ iron rod with cap stamped …”) and found/set status.
  • Field notes and sketches. Even rough sketches help the drafter connect points to features and understand what was observed on site.
  • Point clouds or imagery, if the scope includes features extracted from scan or drone data.

2. Title and record documents

  • The title commitment, including Schedule B exceptions and copies of the documents they refer to. Each exception needs to be addressed on the survey: plotted if it can be plotted, or noted if it can’t.
  • The record description of the subject property and any surveyed description you’ve written.
  • Recorded plats, deeds and easements for the subject property and adjoiners that you used in your analysis.
  • Prior surveys of the site, if you have them and they’re relevant.

3. Scope: the Table A items

The ALTA/NSPS Minimum Standard Detail Requirements list optional Table A items that are negotiated between the surveyor and the client. Tell the drafter exactly which items were agreed. Typical examples include flood zone classification, gross land area, contours, zoning information, building dimensions and area, parking and observed utilities. Each one adds linework, labels, tables or notes, so a clear list avoids both missing items and unrequested extras.

4. Your boundary decisions

This is the part only the surveyor of record can supply. Mark up the record versus measured calls you want shown, how you resolved any conflicts, and any gaps, overlaps or encroachments to be labeled. A drafter can compute, check closure and flag inconsistencies, but the professional judgment on where the boundary is belongs to the licensed surveyor.

5. Certification and notes

Send the certification block the way you want it to read, addressed to the parties named by the client or the title company. Include your standard notes and any job-specific notes, such as access, flood zone source and date, zoning source, or utility locate references. The certification wording follows the current ALTA/NSPS standards, and the signature and seal stay with you.

6. CAD standards and title block

  • Drawing template (DWT) or a recent drawing from your office to match
  • Layer list, block library and linetypes
  • Text and dimension styles, and plot styles (CTB/STB)
  • Your title block, sheet size and preferred scale
  • Any client or lender-specific formatting requirements

Drafting inside your template from the start is what makes the drawing look like it came from your own office, and it saves a round of cleanup at the end.

7. Deliverables and deadline

Say which files you need back (DWG, PDF, DGN or LandXML), how many sheets you expect, and the date you need a first draft for your review. If the title commitment or Table A list might still change, say so up front so the drafter can structure the file for easy updates.

A quick pre-send checklist

  1. Field data with coordinate system, units and basis of bearings
  2. Monument list, field notes and sketches
  3. Title commitment, Schedule B documents and record documents
  4. Agreed Table A items
  5. Your boundary decisions and markups
  6. Certification wording and notes
  7. Template, layers, blocks, title block and plot styles
  8. Deliverable formats and review date

Common questions

Can a drafter work from a partial package?

Yes. Base drafting from the field data can start while title documents are still coming in. Plan for a second pass once Schedule B items are plotted.

Who checks the final drawing?

The drafter should check the drawing internally against your standards and the source data. You, as the surveyor of record, then review, sign and seal it.

Locus CAD Works drafts ALTA/NSPS land title surveys for U.S. surveyors, on your title block and to your CAD standards, under NDA. See land survey drafting or send us your next job.

Locus CAD Works

CAD drafting & survey support for U.S. land surveyors and civil engineers, drafted from India.

Site

Services Process Why Locus About Outsourcing Guides

Contact

info@locuscadworks.com Nashik, India

Follow

LinkedIn
© 2026 Locus CAD Works · Privacy Policy Drafting & design support — final work reviewed & certified by client's licensed professional